πŸ“žCall: +63 966 310 3479

Industrial & Enterprise Cooling β€’ Makati & Taguig

Commercial Aircon Service for BPOs, Offices & Facilities

When a commercial HVAC system, VRV network, or server room aircon fails in Makati or BGC, business halts.

Employee productivity drops, hardware overheats, and power bills spike.

Sterling Air delivers high-capacity commercial maintenance, rapid component repair, and long-term Preventive Maintenance Agreements (PMA) designed for strict corporate SLAs.

Commercial Operational Risk Audit

Unmaintained commercial cooling systems create hidden operational bottlenecks across Metro Manila facilities.

Workstation Overheating

High-density BPO floors generate intense body and computer heat. When central cooling underperforms, employee output drops and HR complaints surge.

Server Room Thermal Shutdown

IT server rooms require precise 24/7 climate control. An unmonitored aircon failure leads to hardware burnout, data corruption, and catastrophic downtime.

Rising Building Energy Demand

Dust-clogged commercial condenser coils force large compressors to draw excess amperage, spiking building electric bills by up to 30% monthly.

Water Leaks Over Office Equipment

Clogged commercial drain pans cause water to back up, leaking through drop ceilings directly onto expensive office laptops, desks, and carpet floorings.

Warehouse Climate Control Failure

High-ceiling warehouses and manufacturing spaces demand specialized high-CFM airflow to protect temperature-sensitive inventory and worker safety.

Unreliable Contractor Delay

Tired of contractors who miss building admin work permit deadlines or fail to show up? Sterling Air adheres strictly to facility schedules and gate passes.

Industrial Engineering & Maintenance Protocols

Full-Scope Commercial HVAC Capabilities

From multi-floor office towers to high-density server rooms, our VRV-certified technicians manage high-capacity commercial cooling systems.

STEP 01 β€’ MAINTENANCE

Multi-Unit Commercial Deep Cleaning

Scheduled anti-bacterial coil sanitation for 10, 20, or 50+ office split and cassette units. Conducted off-hours or on weekends to ensure zero workforce disruption.

STEP 02 β€’ VRV / VRF SYSTEMS

VRV & VRF System Installation & Repair

Precision fault finding, inverter PCB diagnostics, electronic expansion valve testing, and refrigerant balancing for complex Variable Refrigerant Volume networks.

STEP 03 β€’ SERVER ROOMS

Server Room Precision Cooling

Priority 24/7 emergency dispatch, backup unit installation, and NTC sensor calibration for critical IT server rooms and telecommunication hubs in Makati and BGC.

STEP 04 β€’ CHILLERS

Chiller & Centralized Ducted Servicing

Maintenance and repair for whole-floor centralized ducted networks, water-cooled package units, and commercial air handler units (AHUs).

STEP 05 β€’ INDUSTRIAL

Warehouse & Factory High-CFM Cooling

Custom cooling solutions engineered for high ceilings, open warehouse floors, factories, and temperature-controlled storage spaces across Metro Manila.

STEP 06 β€’ FIT-OUTS

Post-Construction & Fit-Out Installs

Seamless coordination with general contractors, architects, and interior designers during new commercial office renovations and building handovers.

STEP 07 β€’ REPAIRS

High-Capacity Commercial Component Repair

Rapid replacement of 3-phase commercial compressors, industrial capacitors, heavy-duty contactors, and high-CFM fan motors to cut business downtime.

STEP 08 β€’ CONTRACTS

Preventive Maintenance Agreements (PMA)

Structured quarterly or bi-monthly maintenance retainer calendars with assigned technicians, digital diagnostic logs, and priority emergency response SLAs.

STEP 09 β€’ COMPLIANCE

Building Admin & SLA Compliance

Full DTI and BIR registration, formal BIR-stamped official receipts, complete technician safety compliance, and building gate pass coordination.

Fragmented Handyman vs Sterling Air Enterprise

See why commercial facility managers trust our registered engineering teams.

COMMERCIAL SERVICE FEATURE
FRAGMENTED HANDYMAN
STERLING AIR ENTERPRISE FACILITIES RECOMMENDED
Legal & Tax Documentation
βœ•
No Official Receipts or formal documentation
βœ“
DTI & BIR registered with BIR Official Receipts
Building Permit Clearance
βœ•
Struggles with condo/office admin gate passes
βœ“
Full safety compliance & admin clearance coordination
VRV / VRF Technical Skill
βœ•
Lacks training on complex inverter networks
βœ“
VRV/VRF specialized fault finding & balancing
Work Schedule Flexibility
βœ•
Only works standard hours (Disrupts office staff)
βœ“
Flexible off-hours, weekend & night shift dispatches
Warranty & Parts Quality
βœ•
Zero post-service SLA or warranty backing
βœ“
30-Day Commercial Parts & Workmanship Warranty

Preventive Maintenance Agreement (PMA)

Structured Cooling Retainers for BPOs, Offices & Facilities

Running a BPO floor, corporate office, or warehouse in Makati or BGC?

Our PMA locks your facility into a scheduled maintenance calendar with dedicated VRV-certified technicians who know your building specs, SLA windows, and compliance paperwork inside out.

βœ” Assigned technicians for your property with full service history
βœ” Scheduled quarterly or bi-monthly maintenance visits
βœ” Off-hours, weekend, and night-shift dispatch to prevent office disruption
βœ” Full building admin coordination, gate passes, and BIR-stamped documentation
βœ” Digital diagnostic logs and priority emergency response SLAs